US Bridges

TR 2A over Williams Ditch

Good

Kankakee County, Illinois · 65. MI E Momence · Structure no. 046350500000000

Built
2016
9 years old
Condition
Good
inspected May 2018
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
59 ft
1 main span
Daily traffic
25
2017 count
Owner
Private
Private (other than railroad)

About this bridge

TR 2A over Williams Ditch is a prestressed concrete box beam or girders - single or spread carrying TR 2A over Williams Ditch in Kankakee County, Illinois. It was built in 2016, so it is 9 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25 vehicles a day, projected to reach 26 by 2046. The structure is 59 ft (18.1 m) long and 29 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesTR 2A
CrossesWilliams Ditch
Location65. MI E Momence
RouteCounty Highway 0
Coordinates41.16965, -87.52659
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2018
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length59 ft (18.1 m)
Longest span57 ft (17.4 m)
Deck width29 ft (8.7 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25 (2017)
Projected traffic26 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerPrivate (other than railroad)
Maintained byPrivate (other than railroad)
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was TR 2A over Williams Ditch built?

It was built in 2016, making it 9 years old in 2025.

What condition is TR 2A over Williams Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2018.

How much traffic does TR 2A over Williams Ditch carry?

About 25 vehicles per day (2017 count).

How long is TR 2A over Williams Ditch?

The structure is 59 ft (18.1 m) long with a longest span of 57 ft (17.4 m) and a deck 29 ft wide.

Who owns TR 2A over Williams Ditch?

It is owned by the Private (other than railroad).