US Bridges

East Stagecoach Ro over Clear Creek

Good

Jo Daviess County, Illinois · 1 Mile West Warren · Structure no. 043329400000000

Built
2020
5 years old
Condition
Good
inspected December 2024
Type
Culvert
Steel
Length
28 ft
3 main spans
Daily traffic
850
2021 count
Owner
County
County Highway Agency

About this bridge

East Stagecoach Ro over Clear Creek is a steel culvert carrying East Stagecoach Ro over Clear Creek in Jo Daviess County, Illinois. It was built in 2020, so it is 5 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 850 vehicles a day, roughly 7% of them trucks, projected to reach 1,300 by 2040. The structure is 28 ft (8.5 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesEast Stagecoach Ro
CrossesClear Creek
Location1 Mile West Warren
RouteCounty Highway 0
Coordinates42.49579, -90.02706
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating98.2 US tons
Inventory rating98.2 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length28 ft (8.5 m)
Longest span0 ft (0 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic850 (2021)
Projected traffic1,300 by 2040
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was East Stagecoach Ro over Clear Creek built?

It was built in 2020, making it 5 years old in 2025.

What condition is East Stagecoach Ro over Clear Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does East Stagecoach Ro over Clear Creek carry?

About 850 vehicles per day (2021 count), of which roughly 7% are trucks.

How long is East Stagecoach Ro over Clear Creek?

The structure is 28 ft (8.5 m) long.

Who owns East Stagecoach Ro over Clear Creek?

It is owned by the County Highway Agency.