US Bridges

FAS-67 E Stagecoac over Br Clear Creek

Good

Jo Daviess County, Illinois · 1.75 MI E Apple Rive · Structure no. 043328400000000

Built
2018
7 years old
Condition
Good
inspected October 2024
Type
Culvert
Concrete Continuous
Length
35 ft
3 main spans
Daily traffic
850
2021 count
Owner
County
County Highway Agency

About this bridge

FAS-67 E Stagecoac over Br Clear Creek is a concrete continuous culvert carrying FAS-67 E Stagecoac over Br Clear Creek in Jo Daviess County, Illinois. It was built in 2018, so it is 7 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 850 vehicles a day, roughly 7% of them trucks, projected to reach 859 by 2046. The structure is 35 ft (10.8 m) long. If it were closed, the detour would be 14.9 mi (24 km).

CarriesFAS-67 E Stagecoac
CrossesBr Clear Creek
Location1.75 MI E Apple Rive
RouteCounty Highway 0
Coordinates42.49575, -90.05144
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans3
Design loadHS 25 or greater
Structure length35 ft (10.8 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic850 (2021)
Projected traffic859 by 2046
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed14.9 mi (24 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAS-67 E Stagecoac over Br Clear Creek built?

It was built in 2018, making it 7 years old in 2025.

What condition is FAS-67 E Stagecoac over Br Clear Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does FAS-67 E Stagecoac over Br Clear Creek carry?

About 850 vehicles per day (2021 count), of which roughly 7% are trucks.

How long is FAS-67 E Stagecoac over Br Clear Creek?

The structure is 35 ft (10.8 m) long with a longest span of 12 ft (3.7 m).

Who owns FAS-67 E Stagecoac over Br Clear Creek?

It is owned by the County Highway Agency.