S Scout Camp Road over Branch of Apple Rive
GoodJo Daviess County, Illinois · 5 Miles NE Elizabeth · Structure no. 043327600000000
- Built
- 2012
- 13 years old
- Condition
- Good
- inspected February 2022
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 83 ft
- 1 main span
- Daily traffic
- 150
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
S Scout Camp Road over Branch of Apple Rive is a prestressed concrete box beam or girders - multiple carrying S Scout Camp Road over Branch of Apple Rive in Jo Daviess County, Illinois. It was built in 2012, so it is 13 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 150 vehicles a day, roughly 20% of them trucks, projected to reach 152 by 2046. The structure is 83 ft (25.4 m) long and 36 ft wide. If it were closed, the detour would be 19.9 mi (32 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S Scout Camp Road over Branch of Apple Rive built?
It was built in 2012, making it 13 years old in 2025.
What condition is S Scout Camp Road over Branch of Apple Rive in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2022.
How much traffic does S Scout Camp Road over Branch of Apple Rive carry?
About 150 vehicles per day (2021 count), of which roughly 20% are trucks.
How long is S Scout Camp Road over Branch of Apple Rive?
The structure is 83 ft (25.4 m) long with a longest span of 81 ft (24.7 m) and a deck 36 ft wide.
Who owns S Scout Camp Road over Branch of Apple Rive?
It is owned by the County Highway Agency.