E. Center RD (TR16 over Little Rush Creek
GoodJo Daviess County, Illinois · 1 Mi. S. of Woodbine · Structure no. 043318300000000
- Built
- 1992
- 33 years old
- Condition
- Good
- inspected March 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 69 ft
- 1 main span
- Daily traffic
- 150
- 2021 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
E. Center RD (TR16 over Little Rush Creek is a prestressed concrete box beam or girders - multiple carrying E. Center RD (TR16 over Little Rush Creek in Jo Daviess County, Illinois. It was built in 1992, so it is 33 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 150 vehicles a day, roughly 12% of them trucks, projected to reach 152 by 2046. The structure is 69 ft (21 m) long and 27 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E. Center RD (TR16 over Little Rush Creek built?
It was built in 1992, making it 33 years old in 2025.
What condition is E. Center RD (TR16 over Little Rush Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does E. Center RD (TR16 over Little Rush Creek carry?
About 150 vehicles per day (2021 count), of which roughly 12% are trucks.
How long is E. Center RD (TR16 over Little Rush Creek?
The structure is 69 ft (21 m) long with a longest span of 68 ft (20.7 m) and a deck 27 ft wide.
Who owns E. Center RD (TR16 over Little Rush Creek?
It is owned by the Town or Township Highway Agency.