TR 190A over Slater Creek
FairHancock County, Illinois · 2.0 MI NW Bowen · Structure no. 034390200000000
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected March 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 39 ft
- 1 main span
- Daily traffic
- 25
- 2023 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 190A over Slater Creek is a prestressed concrete box beam or girders - multiple carrying TR 190A over Slater Creek in Hancock County, Illinois. It was built in 1965, so it is 60 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 25 vehicles a day, projected to reach 25 by 2046. The structure is 39 ft (11.9 m) long and 21 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 190A over Slater Creek built?
It was built in 1965, making it 60 years old in 2025.
What condition is TR 190A over Slater Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does TR 190A over Slater Creek carry?
About 25 vehicles per day (2023 count).
How long is TR 190A over Slater Creek?
The structure is 39 ft (11.9 m) long with a longest span of 35 ft (10.7 m) and a deck 21 ft wide.
Who owns TR 190A over Slater Creek?
It is owned by the Town or Township Highway Agency.