US Bridges

Il 94 over Slater Creek

Fair

Hancock County, Illinois · 2.8M NW IL61 Bowen · Structure no. 034006500000000

Built
1991
34 years old
Condition
Fair
inspected June 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
79 ft
1 main span
Daily traffic
850
2023 count
Owner
State
State Highway Agency

About this bridge

Il 94 over Slater Creek is a steel continuous stringer/multi-beam or girder carrying Il 94 over Slater Creek in Hancock County, Illinois. It was built in 1991, so it is 34 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 850 vehicles a day, roughly 19% of them trucks, projected to reach 328 by 2046. The structure is 79 ft (24.1 m) long and 35 ft wide. If it were closed, the detour would be 21.7 mi (35 km).

CarriesIl 94
CrossesSlater Creek
Location2.8M NW IL61 Bowen
RouteState Highway 94
Coordinates40.25394, -91.09649
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating92.2 US tons
Inventory rating55 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length79 ft (24.1 m)
Longest span74 ft (22.7 m)
Deck width35 ft (10.7 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic850 (2023)
Projected traffic328 by 2046
Trucks19%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed21.7 mi (35 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Il 94 over Slater Creek built?

It was built in 1991, making it 34 years old in 2025.

What condition is Il 94 over Slater Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does Il 94 over Slater Creek carry?

About 850 vehicles per day (2023 count), of which roughly 19% are trucks.

How long is Il 94 over Slater Creek?

The structure is 79 ft (24.1 m) long with a longest span of 74 ft (22.7 m) and a deck 35 ft wide.

Who owns Il 94 over Slater Creek?

It is owned by the State Highway Agency.