Echof Street 3250 over Creek
FairFayette County, Illinois · Farina · Structure no. 026600000000000
- Built
- 1909
- 116 years old
- Condition
- Fair
- inspected January 2024
- Type
- Slab
- Concrete
- Length
- 26 ft
- 1 main span
- Daily traffic
- 50
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Echof Street 3250 over Creek is a concrete slab carrying Echof Street 3250 over Creek in Fayette County, Illinois. It was built in 1909, so it is 116 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50 vehicles a day, roughly 4% of them trucks, projected to reach 102 by 2046. The structure is 26 ft (7.9 m) long and 18 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Echof Street 3250 over Creek built?
It was built in 1909, making it 116 years old in 2025.
What condition is Echof Street 3250 over Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Echof Street 3250 over Creek carry?
About 50 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is Echof Street 3250 over Creek?
The structure is 26 ft (7.9 m) long with a longest span of 24 ft (7.3 m) and a deck 18 ft wide.
Who owns Echof Street 3250 over Creek?
It is owned by the City or Municipal Highway Agency.