CH-11 Schnieder RD over Br First Salt Creek
GoodEffingham County, Illinois · 1.5 MI E Teutopolis · Structure no. 025321100000000
- Built
- 1987
- 38 years old
- Condition
- Good
- inspected November 2022
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 62 ft
- 1 main span
- Daily traffic
- 350
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
CH-11 Schnieder RD over Br First Salt Creek is a prestressed concrete box beam or girders - multiple carrying CH-11 Schnieder RD over Br First Salt Creek in Effingham County, Illinois. It was built in 1987, so it is 38 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 350 vehicles a day, roughly 4% of them trucks, projected to reach 424 by 2046. The structure is 62 ft (18.9 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CH-11 Schnieder RD over Br First Salt Creek built?
It was built in 1987, making it 38 years old in 2025.
What condition is CH-11 Schnieder RD over Br First Salt Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2022.
How much traffic does CH-11 Schnieder RD over Br First Salt Creek carry?
About 350 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is CH-11 Schnieder RD over Br First Salt Creek?
The structure is 62 ft (18.9 m) long with a longest span of 58 ft (17.7 m) and a deck 28 ft wide.
Who owns CH-11 Schnieder RD over Br First Salt Creek?
It is owned by the County Highway Agency.