US Bridges

TR-288 over First Salt Creek

Fair

Effingham County, Illinois · NE Corner Teutopolis · Structure no. 025313000000000

Built
1969
56 years old
Condition
Fair
inspected December 2024
Type
Tee Beam
Concrete
Length
53 ft
2 main spans
Daily traffic
650
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR-288 over First Salt Creek is a concrete tee beam carrying TR-288 over First Salt Creek in Effingham County, Illinois. It was built in 1969, so it is 56 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 650 vehicles a day, roughly 2% of them trucks, projected to reach 636 by 2046. The structure is 53 ft (16.2 m) long and 26 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesTR-288
CrossesFirst Salt Creek
LocationNE Corner Teutopolis
RouteCounty Highway 0
Coordinates39.1407, -88.46727
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating47.5 US tons
Inventory rating28.5 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans2
Design loadUnknown
Structure length53 ft (16.2 m)
Longest span27 ft (8.2 m)
Deck width26 ft (8 m)
Roadway width24 ft (7.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic650 (2023)
Projected traffic636 by 2046
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR-288 over First Salt Creek built?

It was built in 1969, making it 56 years old in 2025.

What condition is TR-288 over First Salt Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does TR-288 over First Salt Creek carry?

About 650 vehicles per day (2023 count), of which roughly 2% are trucks.

How long is TR-288 over First Salt Creek?

The structure is 53 ft (16.2 m) long with a longest span of 27 ft (8.2 m) and a deck 26 ft wide.

Who owns TR-288 over First Salt Creek?

It is owned by the Town or Township Highway Agency.