FAP 332 (IL1) over Sugar Creek
GoodCrawford County, Illinois · 1 MI N Lawrence CO L · Structure no. 017003400000000
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 147 ft
- 3 main spans
- Daily traffic
- 3,600
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 332 (IL1) over Sugar Creek is a steel continuous stringer/multi-beam or girder carrying FAP 332 (IL1) over Sugar Creek in Crawford County, Illinois. It was built in 2022, so it is 3 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,600 vehicles a day, roughly 19% of them trucks, projected to reach 5,000 by 2043. The structure is 147 ft (44.8 m) long and 39 ft wide. If it were closed, the detour would be 41 mi (66 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 332 (IL1) over Sugar Creek built?
It was built in 2022, making it 3 years old in 2025.
What condition is FAP 332 (IL1) over Sugar Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does FAP 332 (IL1) over Sugar Creek carry?
About 3,600 vehicles per day (2023 count), of which roughly 19% are trucks.
How long is FAP 332 (IL1) over Sugar Creek?
The structure is 147 ft (44.8 m) long with a longest span of 47 ft (14.2 m) and a deck 39 ft wide.
Who owns FAP 332 (IL1) over Sugar Creek?
It is owned by the State Highway Agency.