US Bridges

TR 5 over Drainage Ditch

Fair

Lawrence County, Illinois · 1 MI NE Birds · Structure no. 051327200000000

Built
2003
22 years old
Condition
Fair
inspected January 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
62 ft
1 main span
Daily traffic
50
2021 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 5 over Drainage Ditch is a prestressed concrete box beam or girders - multiple carrying TR 5 over Drainage Ditch in Lawrence County, Illinois. It was built in 2003, so it is 22 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, roughly 8% of them trucks, projected to reach 51 by 2046. The structure is 62 ft (18.9 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesTR 5
CrossesDrainage Ditch
Location1 MI NE Birds
RouteCounty Highway 0
Coordinates38.85213, -87.6656
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length62 ft (18.9 m)
Longest span60 ft (18.3 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2021)
Projected traffic51 by 2046
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 5 over Drainage Ditch built?

It was built in 2003, making it 22 years old in 2025.

What condition is TR 5 over Drainage Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does TR 5 over Drainage Ditch carry?

About 50 vehicles per day (2021 count), of which roughly 8% are trucks.

How long is TR 5 over Drainage Ditch?

The structure is 62 ft (18.9 m) long with a longest span of 60 ft (18.3 m) and a deck 28 ft wide.

Who owns TR 5 over Drainage Ditch?

It is owned by the Town or Township Highway Agency.