US Bridges

Euclid Ave. over Salt Creek

Good

Cook County, Illinois · 0.4M.W.OF Plum Gr.Rd · Structure no. 016325200000000

Built
1973
52 years old
Condition
Good
inspected April 2023
Type
Culvert
Concrete Continuous
Length
23 ft
2 main spans
Daily traffic
18,000
2022 count
Owner
County
County Highway Agency

About this bridge

Euclid Ave. over Salt Creek is a concrete continuous culvert carrying Euclid Ave. over Salt Creek in Cook County, Illinois. It was built in 1973, so it is 52 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,000 vehicles a day, roughly 4% of them trucks, projected to reach 20,806 by 2046. The structure is 23 ft (7 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesEuclid Ave.
CrossesSalt Creek
Location0.4M.W.OF Plum Gr.Rd
Coordinates42.08863, -88.05242
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65.7 US tons
Inventory rating39.2 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHS 20
Structure length23 ft (7 m)
Longest span11 ft (3.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,000 (2022)
Projected traffic20,806 by 2046
Trucks4%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Euclid Ave. over Salt Creek built?

It was built in 1973, making it 52 years old in 2025.

What condition is Euclid Ave. over Salt Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Euclid Ave. over Salt Creek carry?

About 18,000 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is Euclid Ave. over Salt Creek?

The structure is 23 ft (7 m) long with a longest span of 11 ft (3.4 m).

Who owns Euclid Ave. over Salt Creek?

It is owned by the County Highway Agency.