Ch 4 (huey Rd) over Prairie Creek
GoodClinton County, Illinois · 1.0 Mile N of Hoffman · Structure no. 014511600000000
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected October 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 165 ft
- 3 main spans
- Daily traffic
- 725
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Ch 4 (huey Rd) over Prairie Creek is a prestressed concrete box beam or girders - multiple carrying Ch 4 (huey Rd) over Prairie Creek in Clinton County, Illinois. It was built in 2024, so it is 1 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 725 vehicles a day, roughly 8% of them trucks, projected to reach 798 by 2046. The structure is 165 ft (50.2 m) long and 28 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ch 4 (huey Rd) over Prairie Creek built?
It was built in 2024, making it 1 years old in 2025.
What condition is Ch 4 (huey Rd) over Prairie Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Ch 4 (huey Rd) over Prairie Creek carry?
About 725 vehicles per day (2020 count), of which roughly 8% are trucks.
How long is Ch 4 (huey Rd) over Prairie Creek?
The structure is 165 ft (50.2 m) long with a longest span of 62 ft (18.9 m) and a deck 28 ft wide.
Who owns Ch 4 (huey Rd) over Prairie Creek?
It is owned by the County Highway Agency.