US Bridges

2nd ST (ms 7600A) over Owl Creek

Good

Champaign County, Illinois · In Fisher · Structure no. 010606300000000

Built
1997
28 years old
Condition
Good
inspected January 2025
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
44 ft
1 main span
Daily traffic
150
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

2nd ST (ms 7600A) over Owl Creek is a prestressed concrete box beam or girders - multiple carrying 2nd ST (ms 7600A) over Owl Creek in Champaign County, Illinois. It was built in 1997, so it is 28 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 150 vehicles a day, roughly 3% of them trucks, projected to reach 152 by 2046. The structure is 44 ft (13.4 m) long and 33 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries2nd ST (ms 7600A)
CrossesOwl Creek
LocationIn Fisher
RouteCity Street 0
Coordinates40.31465, -88.34818
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length44 ft (13.4 m)
Longest span40 ft (12.2 m)
Deck width33 ft (10.1 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic150 (2021)
Projected traffic152 by 2046
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 2nd ST (ms 7600A) over Owl Creek built?

It was built in 1997, making it 28 years old in 2025.

What condition is 2nd ST (ms 7600A) over Owl Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does 2nd ST (ms 7600A) over Owl Creek carry?

About 150 vehicles per day (2021 count), of which roughly 3% are trucks.

How long is 2nd ST (ms 7600A) over Owl Creek?

The structure is 44 ft (13.4 m) long with a longest span of 40 ft (12.2 m) and a deck 33 ft wide.

Who owns 2nd ST (ms 7600A) over Owl Creek?

It is owned by the City or Municipal Highway Agency.