Rising Road over Copper Slough
FairChampaign County, Illinois · 2 MI E of Champaign · Structure no. 010404300000000
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected September 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 53 ft
- 1 main span
- Daily traffic
- 1,200
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Rising Road over Copper Slough is a prestressed concrete box beam or girders - multiple carrying Rising Road over Copper Slough in Champaign County, Illinois. It was built in 1975, so it is 50 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,200 vehicles a day, roughly 3% of them trucks, projected to reach 1,212 by 2046. The structure is 53 ft (16.2 m) long and 27 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Rising Road over Copper Slough built?
It was built in 1975, making it 50 years old in 2025.
What condition is Rising Road over Copper Slough in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Rising Road over Copper Slough carry?
About 1,200 vehicles per day (2021 count), of which roughly 3% are trucks.
How long is Rising Road over Copper Slough?
The structure is 53 ft (16.2 m) long with a longest span of 51 ft (15.5 m) and a deck 27 ft wide.
Who owns Rising Road over Copper Slough?
It is owned by the City or Municipal Highway Agency.