FAU 715/ Staley RD over Phinney Branch
FairChampaign County, Illinois · W Edge of Champaign · Structure no. 010448400000000
- Built
- 2006
- 19 years old
- Condition
- Fair
- inspected September 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 66 ft
- 1 main span
- Daily traffic
- 6,850
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
FAU 715/ Staley RD over Phinney Branch is a prestressed concrete box beam or girders - multiple carrying FAU 715/ Staley RD over Phinney Branch in Champaign County, Illinois. It was built in 2006, so it is 19 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,850 vehicles a day, roughly 5% of them trucks, projected to reach 7,171 by 2046. The structure is 66 ft (20.1 m) long and 42 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU 715/ Staley RD over Phinney Branch built?
It was built in 2006, making it 19 years old in 2025.
What condition is FAU 715/ Staley RD over Phinney Branch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does FAU 715/ Staley RD over Phinney Branch carry?
About 6,850 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is FAU 715/ Staley RD over Phinney Branch?
The structure is 66 ft (20.1 m) long with a longest span of 63 ft (19.3 m) and a deck 42 ft wide.
Who owns FAU 715/ Staley RD over Phinney Branch?
It is owned by the City or Municipal Highway Agency.