US Bridges

TR 21 over Dickerson Slough

Fair

Champaign County, Illinois · 4.5 N of Fisher · Structure no. 010400000000000

Built
1975
50 years old
Condition
Fair
inspected June 2023
Type
Channel Beam
Concrete
Length
102 ft
3 main spans
Daily traffic
50
2021 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 21 over Dickerson Slough is a concrete channel beam carrying TR 21 over Dickerson Slough in Champaign County, Illinois. It was built in 1975, so it is 50 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, projected to reach 51 by 2046. The structure is 102 ft (31.1 m) long and 23 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesTR 21
CrossesDickerson Slough
Location4.5 N of Fisher
RouteCounty Highway 0
Coordinates40.37662, -88.33596
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating51.5 US tons
Inventory rating30.8 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans3
Design loadHS 15
Structure length102 ft (31.1 m)
Longest span36 ft (11 m)
Deck width23 ft (6.9 m)
Roadway width22 ft (6.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2021)
Projected traffic51 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 21 over Dickerson Slough built?

It was built in 1975, making it 50 years old in 2025.

What condition is TR 21 over Dickerson Slough in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does TR 21 over Dickerson Slough carry?

About 50 vehicles per day (2021 count).

How long is TR 21 over Dickerson Slough?

The structure is 102 ft (31.1 m) long with a longest span of 36 ft (11 m) and a deck 23 ft wide.

Who owns TR 21 over Dickerson Slough?

It is owned by the Town or Township Highway Agency.