US Bridges

TR 80 over Stream

Fair

Champaign County, Illinois · 2.8 MI N Fisher · Structure no. 010333700000000

Built
1969
56 years old
Condition
Fair
inspected February 2024
Type
Channel Beam
Concrete
Length
32 ft
1 main span
Daily traffic
175
2021 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 80 over Stream is a concrete channel beam carrying TR 80 over Stream in Champaign County, Illinois. It was built in 1969, so it is 56 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 175 vehicles a day, roughly 1% of them trucks, projected to reach 177 by 2046. The structure is 32 ft (9.8 m) long and 23 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesTR 80
CrossesStream
Location2.8 MI N Fisher
RouteCounty Highway 0
Coordinates40.35767, -88.34686
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating68.6 US tons
Inventory rating41.1 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHS 15
Structure length32 ft (9.8 m)
Longest span32 ft (9.7 m)
Deck width23 ft (6.9 m)
Roadway width20 ft (6.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic175 (2021)
Projected traffic177 by 2046
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 80 over Stream built?

It was built in 1969, making it 56 years old in 2025.

What condition is TR 80 over Stream in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does TR 80 over Stream carry?

About 175 vehicles per day (2021 count), of which roughly 1% are trucks.

How long is TR 80 over Stream?

The structure is 32 ft (9.8 m) long with a longest span of 32 ft (9.7 m) and a deck 23 ft wide.

Who owns TR 80 over Stream?

It is owned by the Town or Township Highway Agency.