TR 197 over Salt Fork Verm Riv
GoodChampaign County, Illinois · 2 MI SW ST Joseph · Structure no. 010334100000000
- Built
- 1972
- 53 years old
- Condition
- Good
- inspected January 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 53 ft
- 1 main span
- Daily traffic
- 225
- 2021 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 197 over Salt Fork Verm Riv is a prestressed concrete box beam or girders - multiple carrying TR 197 over Salt Fork Verm Riv in Champaign County, Illinois. It was built in 1972, so it is 53 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 225 vehicles a day, roughly 4% of them trucks, projected to reach 227 by 2046. The structure is 53 ft (16.2 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 197 over Salt Fork Verm Riv built?
It was built in 1972, making it 53 years old in 2025.
What condition is TR 197 over Salt Fork Verm Riv in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does TR 197 over Salt Fork Verm Riv carry?
About 225 vehicles per day (2021 count), of which roughly 4% are trucks.
How long is TR 197 over Salt Fork Verm Riv?
The structure is 53 ft (16.2 m) long with a longest span of 52 ft (15.8 m) and a deck 24 ft wide.
Who owns TR 197 over Salt Fork Verm Riv?
It is owned by the Town or Township Highway Agency.