US 150(FAS 1512) over Salt Fork River
GoodChampaign County, Illinois · 1 MI W ST Joseph · Structure no. 010003900000000
- Built
- 1939
- 86 years old, rebuilt 1990
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 251 ft
- 3 main spans
- Daily traffic
- 5,550
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US 150(FAS 1512) over Salt Fork River is a steel continuous stringer/multi-beam or girder carrying US 150(FAS 1512) over Salt Fork River in Champaign County, Illinois. It was built in 1939 and reconstructed in 1990, so it is 86 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,550 vehicles a day, roughly 6% of them trucks, projected to reach 5,550 by 2046. The structure is 251 ft (76.5 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 150(FAS 1512) over Salt Fork River built?
It was built in 1939, making it 86 years old in 2025. It was reconstructed in 1990.
What condition is US 150(FAS 1512) over Salt Fork River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does US 150(FAS 1512) over Salt Fork River carry?
About 5,550 vehicles per day (2023 count), of which roughly 6% are trucks.
How long is US 150(FAS 1512) over Salt Fork River?
The structure is 251 ft (76.5 m) long with a longest span of 96 ft (29.4 m) and a deck 35 ft wide.
Who owns US 150(FAS 1512) over Salt Fork River?
It is owned by the State Highway Agency.