Stc 5756;BIG CR RD over Big Creek;sunshine Mine
GoodShoshone County, Idaho · 6.3 E. Kellogg · Structure no. 000000000020550
- Built
- 1977
- 48 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 70 ft
- 1 main span
- Daily traffic
- 60
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Stc 5756;BIG CR RD over Big Creek;sunshine Mine is a prestressed concrete stringer/multi-beam or girder carrying Stc 5756;BIG CR RD over Big Creek;sunshine Mine in Shoshone County, Idaho. It was built in 1977, so it is 48 years old, older than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 60 vehicles a day, roughly 99% of them trucks, projected to reach 90 by 2042. The structure is 70 ft (21.3 m) long and 32 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stc 5756;BIG CR RD over Big Creek;sunshine Mine built?
It was built in 1977, making it 48 years old in 2025.
What condition is Stc 5756;BIG CR RD over Big Creek;sunshine Mine in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Stc 5756;BIG CR RD over Big Creek;sunshine Mine carry?
About 60 vehicles per day (2023 count), of which roughly 99% are trucks.
How long is Stc 5756;BIG CR RD over Big Creek;sunshine Mine?
The structure is 70 ft (21.3 m) long with a longest span of 67 ft (20.4 m) and a deck 32 ft wide.
Who owns Stc 5756;BIG CR RD over Big Creek;sunshine Mine?
It is owned by the County Highway Agency.