I 90 EB & WB over S.Fk.Cda R;fr.Rd.
FairShoshone County, Idaho · 1.9 W. Wallace · Structure no. 000000000017225
- Built
- 1978
- 47 years old
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 569 ft
- 6 main spans
- Daily traffic
- 11,000
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I 90 EB & WB over S.Fk.Cda R;fr.Rd. is a prestressed concrete stringer/multi-beam or girder carrying I 90 EB & WB over S.Fk.Cda R;fr.Rd. in Shoshone County, Idaho. It was built in 1978, so it is 47 years old, older than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,000 vehicles a day, roughly 36% of them trucks, projected to reach 16,500 by 2042. The structure is 569 ft (173.4 m) long and 82 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 90 EB & WB over S.Fk.Cda R;fr.Rd. built?
It was built in 1978, making it 47 years old in 2025.
What condition is I 90 EB & WB over S.Fk.Cda R;fr.Rd. in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does I 90 EB & WB over S.Fk.Cda R;fr.Rd. carry?
About 11,000 vehicles per day (2023 count), of which roughly 36% are trucks.
How long is I 90 EB & WB over S.Fk.Cda R;fr.Rd.?
The structure is 569 ft (173.4 m) long with a longest span of 96 ft (29.4 m) and a deck 82 ft wide.
Who owns I 90 EB & WB over S.Fk.Cda R;fr.Rd.?
It is owned by the State Highway Agency.