I 86 Ebl over Portneuf River
FairPower County, Idaho · 2.7 W. Chubbuck · Structure no. 000000000010870
- Built
- 1968
- 57 years old
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 96 ft
- 3 main spans
- Daily traffic
- 6,750
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I 86 Ebl over Portneuf River is a concrete stringer/multi-beam or girder carrying I 86 Ebl over Portneuf River in Power County, Idaho. It was built in 1968, so it is 57 years old, older than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,750 vehicles a day, roughly 24% of them trucks, projected to reach 10,125 by 2042. The structure is 96 ft (29.3 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 86 Ebl over Portneuf River built?
It was built in 1968, making it 57 years old in 2025.
What condition is I 86 Ebl over Portneuf River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does I 86 Ebl over Portneuf River carry?
About 6,750 vehicles per day (2023 count), of which roughly 24% are trucks.
How long is I 86 Ebl over Portneuf River?
The structure is 96 ft (29.3 m) long with a longest span of 32 ft (9.8 m) and a deck 40 ft wide.
Who owns I 86 Ebl over Portneuf River?
It is owned by the State Highway Agency.