Slickpoo Road over Mission Cr;m.Wittman Br
FairNez Perce County, Idaho · 3.8 S. 1.6 W. Culdesac · Structure no. 000000000029940
- Built
- 1987
- 38 years old, rebuilt 2011
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 26 ft
- 1 main span
- Daily traffic
- 50
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Slickpoo Road over Mission Cr;m.Wittman Br is a steel stringer/multi-beam or girder carrying Slickpoo Road over Mission Cr;m.Wittman Br in Nez Perce County, Idaho. It was built in 1987 and reconstructed in 2011, so it is 38 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50 vehicles a day, roughly 10% of them trucks, projected to reach 75 by 2039. The structure is 26 ft (7.9 m) long and 21 ft wide. If it were closed, the detour would be 19.3 mi (31 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Slickpoo Road over Mission Cr;m.Wittman Br built?
It was built in 1987, making it 38 years old in 2025. It was reconstructed in 2011.
What condition is Slickpoo Road over Mission Cr;m.Wittman Br in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Slickpoo Road over Mission Cr;m.Wittman Br carry?
About 50 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is Slickpoo Road over Mission Cr;m.Wittman Br?
The structure is 26 ft (7.9 m) long with a longest span of 23 ft (7 m) and a deck 21 ft wide.
Who owns Slickpoo Road over Mission Cr;m.Wittman Br?
It is owned by the County Highway Agency.