Leon Road over Union Flat Creek
FairPosted for loadNez Perce County, Idaho · 1.5 S. 5.3 W. Genesee · Structure no. 000000000029925
- Built
- 1938
- 87 years old, rebuilt 1962
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 50 ft
- 1 main span
- Daily traffic
- 40
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Leon Road over Union Flat Creek is a steel stringer/multi-beam or girder carrying Leon Road over Union Flat Creek in Nez Perce County, Idaho. It was built in 1938 and reconstructed in 1962, so it is 87 years old, older than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 40 vehicles a day, roughly 10% of them trucks, projected to reach 60 by 2039. The structure is 50 ft (15.2 m) long and 24 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Leon Road over Union Flat Creek built?
It was built in 1938, making it 87 years old in 2025. It was reconstructed in 1962.
What condition is Leon Road over Union Flat Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does Leon Road over Union Flat Creek carry?
About 40 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is Leon Road over Union Flat Creek?
The structure is 50 ft (15.2 m) long with a longest span of 49 ft (14.9 m) and a deck 24 ft wide.
Who owns Leon Road over Union Flat Creek?
It is owned by the County Highway Agency.