Stc 6768;S 600 E over S. Fork Snake River
FairMadison County, Idaho · 0.6 E. 3.5 N. Ririe · Structure no. 000000000020966
- Built
- 1999
- 26 years old
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 163 ft
- 2 main spans
- Daily traffic
- 1,600
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Stc 6768;S 600 E over S. Fork Snake River is a prestressed concrete stringer/multi-beam or girder carrying Stc 6768;S 600 E over S. Fork Snake River in Madison County, Idaho. It was built in 1999, so it is 26 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,600 vehicles a day, roughly 24% of them trucks, projected to reach 2,400 by 2042. The structure is 163 ft (49.7 m) long and 33 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stc 6768;S 600 E over S. Fork Snake River built?
It was built in 1999, making it 26 years old in 2025.
What condition is Stc 6768;S 600 E over S. Fork Snake River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Stc 6768;S 600 E over S. Fork Snake River carry?
About 1,600 vehicles per day (2023 count), of which roughly 24% are trucks.
How long is Stc 6768;S 600 E over S. Fork Snake River?
The structure is 163 ft (49.7 m) long with a longest span of 80 ft (24.4 m) and a deck 33 ft wide.
Who owns Stc 6768;S 600 E over S. Fork Snake River?
It is owned by the County Highway Agency.