US Bridges

Fs Route No. 534 over Potter Creek

Good

Kootenai County, Idaho · Potter CR Above Trail CR · Structure no. 010403000013125

Built
2010
15 years old
Condition
Good
inspected August 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
63 ft
1 main span
Daily traffic
40
2018 count
Owner
Federal
U.S. Forest Service

About this bridge

Fs Route No. 534 over Potter Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying Fs Route No. 534 over Potter Creek in Kootenai County, Idaho. It was built in 2010, so it is 15 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 40 vehicles a day, projected to reach 60 by 2045. The structure is 63 ft (19.1 m) long and 16 ft wide. If it were closed, the detour would be 620.7 mi (999 km).

CarriesFs Route No. 534
CrossesPotter Creek
LocationPotter CR Above Trail CR
RouteFederal Lands Road 534
StateIdaho
Coordinates47.81665, -116.34494
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating45.7 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckOther
Main spans1
Design loadHS 20
Structure length63 ft (19.1 m)
Longest span60 ft (18.3 m)
Deck width16 ft (5 m)
Roadway width14 ft (4.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic40 (2018)
Projected traffic60 by 2045
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed620.7 mi (999 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Fs Route No. 534 over Potter Creek built?

It was built in 2010, making it 15 years old in 2025.

What condition is Fs Route No. 534 over Potter Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2022.

How much traffic does Fs Route No. 534 over Potter Creek carry?

About 40 vehicles per day (2018 count).

How long is Fs Route No. 534 over Potter Creek?

The structure is 63 ft (19.1 m) long with a longest span of 60 ft (18.3 m) and a deck 16 ft wide.

Who owns Fs Route No. 534 over Potter Creek?

It is owned by the U.S. Forest Service.