US Bridges

Fs Route No. 209 over N.F.Cda River

Fair

Kootenai County, Idaho · At Lewelling Creek · Structure no. 010403000000228

Built
1953
72 years old
Condition
Fair
inspected September 2023
Type
Stringer/Multi-beam or Girder
Wood or Timber
Length
29 ft
1 main span
Daily traffic
50
Owner
Federal
U.S. Forest Service

About this bridge

Fs Route No. 209 over N.F.Cda River is a wood or timber stringer/multi-beam or girder carrying Fs Route No. 209 over N.F.Cda River in Kootenai County, Idaho. It was built in 1953, so it is 72 years old, older than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 29 ft (8.8 m) long and 15 ft wide. If it were closed, the detour would be 620.7 mi (999 km).

CarriesFs Route No. 209
CrossesN.F.Cda River
LocationAt Lewelling Creek
RouteFederal Lands Road 209
StateIdaho
Coordinates47.84408, -116.50074
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating37.1 US tons
Inventory rating28.5 US tons

Structure

MaterialWood or Timber
DeckWood or timber
Main spans1
Design loadOther
Structure length29 ft (8.8 m)
Longest span27 ft (8.3 m)
Deck width15 ft (4.7 m)
Roadway width13 ft (4.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (—)
Projected traffic75 by 2045
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed620.7 mi (999 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Fs Route No. 209 over N.F.Cda River built?

It was built in 1953, making it 72 years old in 2025.

What condition is Fs Route No. 209 over N.F.Cda River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Fs Route No. 209 over N.F.Cda River carry?

About 50 vehicles per day (latest count).

How long is Fs Route No. 209 over N.F.Cda River?

The structure is 29 ft (8.8 m) long with a longest span of 27 ft (8.3 m) and a deck 15 ft wide.

Who owns Fs Route No. 209 over N.F.Cda River?

It is owned by the U.S. Forest Service.