US Bridges

S7227;POINTE Pkwy over Riverbend Ave

Good

Kootenai County, Idaho · At Post Falls Wcl · Structure no. 000000000033770

Built
2013
12 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
82 ft
1 main span
Daily traffic
3,200
2023 count
Owner
State
State Highway Agency

About this bridge

S7227;POINTE Pkwy over Riverbend Ave is a prestressed concrete stringer/multi-beam or girder carrying S7227;POINTE Pkwy over Riverbend Ave in Kootenai County, Idaho. It was built in 2013, so it is 12 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,200 vehicles a day, projected to reach 4,800 by 2042. The structure is 82 ft (25 m) long and 103 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesS7227;POINTE Pkwy
CrossesRiverbend Ave
LocationAt Post Falls Wcl
RouteCity Street 7227
StateIdaho
Coordinates47.7005, -117.01869
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating53.6 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length82 ft (25 m)
Longest span80 ft (24.4 m)
Deck width103 ft (31.5 m)
Roadway width89 ft (27.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,200 (2023)
Projected traffic4,800 by 2042
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was S7227;POINTE Pkwy over Riverbend Ave built?

It was built in 2013, making it 12 years old in 2025.

What condition is S7227;POINTE Pkwy over Riverbend Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does S7227;POINTE Pkwy over Riverbend Ave carry?

About 3,200 vehicles per day (2023 count).

How long is S7227;POINTE Pkwy over Riverbend Ave?

The structure is 82 ft (25 m) long with a longest span of 80 ft (24.4 m) and a deck 103 ft wide.

Who owns S7227;POINTE Pkwy over Riverbend Ave?

It is owned by the State Highway Agency.