I 90 Wbl over SH 41;SH 41 Ic
FairKootenai County, Idaho · 1.7 E. Post Falls · Structure no. 000000000016790
- Built
- 1971
- 54 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 130 ft
- 3 main spans
- Daily traffic
- 32,250
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I 90 Wbl over SH 41;SH 41 Ic is a prestressed concrete stringer/multi-beam or girder carrying I 90 Wbl over SH 41;SH 41 Ic in Kootenai County, Idaho. It was built in 1971, so it is 54 years old, older than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 32,250 vehicles a day, roughly 9% of them trucks, projected to reach 48,375 by 2042. The structure is 130 ft (39.6 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 90 Wbl over SH 41;SH 41 Ic built?
It was built in 1971, making it 54 years old in 2025.
What condition is I 90 Wbl over SH 41;SH 41 Ic in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does I 90 Wbl over SH 41;SH 41 Ic carry?
About 32,250 vehicles per day (2023 count), of which roughly 9% are trucks.
How long is I 90 Wbl over SH 41;SH 41 Ic?
The structure is 130 ft (39.6 m) long with a longest span of 48 ft (14.6 m) and a deck 46 ft wide.
Who owns I 90 Wbl over SH 41;SH 41 Ic?
It is owned by the State Highway Agency.