S7525;GREENSFERRY over I 90 Eb-Wb;schneidmiller
GoodKootenai County, Idaho · 1.0 W of I-90/SH-41 Ic · Structure no. 000000000016773
- Built
- 2015
- 10 years old
- Condition
- Good
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 334 ft
- 3 main spans
- Daily traffic
- 11,000
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
S7525;GREENSFERRY over I 90 Eb-Wb;schneidmiller is a prestressed concrete continuous stringer/multi-beam or girder carrying S7525;GREENSFERRY over I 90 Eb-Wb;schneidmiller in Kootenai County, Idaho. It was built in 2015, so it is 10 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,000 vehicles a day, roughly 2% of them trucks, projected to reach 16,500 by 2042. The structure is 334 ft (101.8 m) long and 74 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S7525;GREENSFERRY over I 90 Eb-Wb;schneidmiller built?
It was built in 2015, making it 10 years old in 2025.
What condition is S7525;GREENSFERRY over I 90 Eb-Wb;schneidmiller in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does S7525;GREENSFERRY over I 90 Eb-Wb;schneidmiller carry?
About 11,000 vehicles per day (2023 count), of which roughly 2% are trucks.
How long is S7525;GREENSFERRY over I 90 Eb-Wb;schneidmiller?
The structure is 334 ft (101.8 m) long with a longest span of 115 ft (35.1 m) and a deck 74 ft wide.
Who owns S7525;GREENSFERRY over I 90 Eb-Wb;schneidmiller?
It is owned by the State Highway Agency.