US Bridges

S7525;GREENSFERRY over I 90 Eb-Wb;schneidmiller

Good

Kootenai County, Idaho · 1.0 W of I-90/SH-41 Ic · Structure no. 000000000016773

Built
2015
10 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
334 ft
3 main spans
Daily traffic
11,000
2023 count
Owner
State
State Highway Agency

About this bridge

S7525;GREENSFERRY over I 90 Eb-Wb;schneidmiller is a prestressed concrete continuous stringer/multi-beam or girder carrying S7525;GREENSFERRY over I 90 Eb-Wb;schneidmiller in Kootenai County, Idaho. It was built in 2015, so it is 10 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,000 vehicles a day, roughly 2% of them trucks, projected to reach 16,500 by 2042. The structure is 334 ft (101.8 m) long and 74 ft wide.

CarriesS7525;GREENSFERRY
CrossesI 90 Eb-Wb;schneidmiller
Location1.0 W of I-90/SH-41 Ic
RouteCity Street 7525
StateIdaho
Coordinates47.712, -116.91594
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.9 US tons
Inventory rating40.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length334 ft (101.8 m)
Longest span115 ft (35.1 m)
Deck width74 ft (22.7 m)
Roadway width60 ft (18.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,000 (2023)
Projected traffic16,500 by 2042
Trucks2%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was S7525;GREENSFERRY over I 90 Eb-Wb;schneidmiller built?

It was built in 2015, making it 10 years old in 2025.

What condition is S7525;GREENSFERRY over I 90 Eb-Wb;schneidmiller in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does S7525;GREENSFERRY over I 90 Eb-Wb;schneidmiller carry?

About 11,000 vehicles per day (2023 count), of which roughly 2% are trucks.

How long is S7525;GREENSFERRY over I 90 Eb-Wb;schneidmiller?

The structure is 334 ft (101.8 m) long with a longest span of 115 ft (35.1 m) and a deck 74 ft wide.

Who owns S7525;GREENSFERRY over I 90 Eb-Wb;schneidmiller?

It is owned by the State Highway Agency.