SH 3 over Rose Lake Overpass
FairKootenai County, Idaho · 3.1 S. Rose Lake · Structure no. 000000000010136
- Built
- 1997
- 28 years old, rebuilt 2015
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 257 ft
- 3 main spans
- Daily traffic
- 1,900
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SH 3 over Rose Lake Overpass is a prestressed concrete stringer/multi-beam or girder carrying SH 3 over Rose Lake Overpass in Kootenai County, Idaho. It was built in 1997 and reconstructed in 2015, so it is 28 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,900 vehicles a day, roughly 17% of them trucks, projected to reach 2,850 by 2042. The structure is 257 ft (78.3 m) long and 40 ft wide. If it were closed, the detour would be 23 mi (37 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 3 over Rose Lake Overpass built?
It was built in 1997, making it 28 years old in 2025. It was reconstructed in 2015.
What condition is SH 3 over Rose Lake Overpass in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does SH 3 over Rose Lake Overpass carry?
About 1,900 vehicles per day (2023 count), of which roughly 17% are trucks.
How long is SH 3 over Rose Lake Overpass?
The structure is 257 ft (78.3 m) long with a longest span of 89 ft (27.1 m) and a deck 40 ft wide.
Who owns SH 3 over Rose Lake Overpass?
It is owned by the State Highway Agency.