2300 East Road over Milner Gooding Canal
FairJerome County, Idaho · 3.0 N. 3.4 E. Hazelton · Structure no. 000000000024560
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected March 2023
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 78 ft
- 1 main span
- Daily traffic
- 90
- 2023 count
- Owner
- Local
- Other Local Agency
About this bridge
2300 East Road over Milner Gooding Canal is a prestressed concrete tee beam carrying 2300 East Road over Milner Gooding Canal in Jerome County, Idaho. It was built in 1975, so it is 50 years old, older than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 90 vehicles a day, roughly 50% of them trucks, projected to reach 135 by 2042. The structure is 78 ft (23.8 m) long and 24 ft wide. If it were closed, the detour would be 19.3 mi (31 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 2300 East Road over Milner Gooding Canal built?
It was built in 1975, making it 50 years old in 2025.
What condition is 2300 East Road over Milner Gooding Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does 2300 East Road over Milner Gooding Canal carry?
About 90 vehicles per day (2023 count), of which roughly 50% are trucks.
How long is 2300 East Road over Milner Gooding Canal?
The structure is 78 ft (23.8 m) long with a longest span of 77 ft (23.5 m) and a deck 24 ft wide.
Who owns 2300 East Road over Milner Gooding Canal?
It is owned by the Other Local Agency.