US Bridges

2200 East Road over T.F.Northside Main Cnl

Fair

Jerome County, Idaho · 0.3 S. 3.0 E. Hazelton · Structure no. 000000000024755

Built
1969
56 years old
Condition
Fair
inspected March 2024
Type
Tee Beam
Prestressed Concrete
Length
82 ft
2 main spans
Daily traffic
310
2023 count
Owner
Local
Other Local Agency

About this bridge

2200 East Road over T.F.Northside Main Cnl is a prestressed concrete tee beam carrying 2200 East Road over T.F.Northside Main Cnl in Jerome County, Idaho. It was built in 1969, so it is 56 years old, older than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 310 vehicles a day, roughly 3% of them trucks, projected to reach 465 by 2042. The structure is 82 ft (25 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

Carries2200 East Road
CrossesT.F.Northside Main Cnl
Location0.3 S. 3.0 E. Hazelton
RouteCounty Highway 0
StateIdaho
Coordinates42.59103, -114.07781
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating38 US tons
Inventory rating23 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2
Design loadH 15
Structure length82 ft (25 m)
Longest span40 ft (12.2 m)
Deck width24 ft (7.3 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic310 (2023)
Projected traffic465 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$794,000
NavigationNo navigation control on waterway

Frequently asked questions

When was 2200 East Road over T.F.Northside Main Cnl built?

It was built in 1969, making it 56 years old in 2025.

What condition is 2200 East Road over T.F.Northside Main Cnl in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does 2200 East Road over T.F.Northside Main Cnl carry?

About 310 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is 2200 East Road over T.F.Northside Main Cnl?

The structure is 82 ft (25 m) long with a longest span of 40 ft (12.2 m) and a deck 24 ft wide.

Who owns 2200 East Road over T.F.Northside Main Cnl?

It is owned by the Other Local Agency.