US Bridges

Forest Road 357 over Running CR

Poor

Idaho County, Idaho · No Data Entered · Structure no. 011705000000050

Built
1956
69 years old, rebuilt 1987
Condition
Poor
inspected October 2022
Type
Stringer/Multi-beam or Girder
Wood or Timber
Length
32 ft
1 main span
Daily traffic
50
Owner
Federal
U.S. Forest Service

About this bridge

Forest Road 357 over Running CR is a wood or timber stringer/multi-beam or girder carrying Forest Road 357 over Running CR in Idaho County, Idaho. It was built in 1956 and reconstructed in 1987, so it is 69 years old, older than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 32 ft (9.9 m) long and 16 ft wide. If it were closed, the detour would be 98.2 mi (158 km).

CarriesForest Road 357
CrossesRunning CR
LocationNo Data Entered
RouteFederal Lands Road 357
StateIdaho
Coordinates45.8558, -114.9192
Functional classRural Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure3 SeriousLoss of section, deterioration, spalling or scour have seriously affected primary structural components.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2022
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating20.7 US tons
Inventory rating16.1 US tons

Structure

MaterialWood or Timber
DeckWood or timber
Main spans1
Design loadH 20
Structure length32 ft (9.9 m)
Longest span31 ft (9.5 m)
Deck width16 ft (4.9 m)
Roadway width14 ft (4.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (—)
Projected traffic75 by 2045
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.2 mi (158 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Forest Road 357 over Running CR built?

It was built in 1956, making it 69 years old in 2025. It was reconstructed in 1987.

What condition is Forest Road 357 over Running CR in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in October 2022.

How much traffic does Forest Road 357 over Running CR carry?

About 50 vehicles per day (latest count).

How long is Forest Road 357 over Running CR?

The structure is 32 ft (9.9 m) long with a longest span of 31 ft (9.5 m) and a deck 16 ft wide.

Who owns Forest Road 357 over Running CR?

It is owned by the U.S. Forest Service.