US Bridges

No Data Entered over No Data Entered

Good

Idaho County, Idaho · No Data Entered · Structure no. 010304000012510

Built
2011
14 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
47 ft
1 main span
Daily traffic
10
Owner
Federal
U.S. Forest Service

About this bridge

No Data Entered over No Data Entered is a prestressed concrete stringer/multi-beam or girder carrying No Data Entered over No Data Entered in Idaho County, Idaho. It was built in 2011, so it is 14 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10 vehicles a day, projected to reach 15 by 2045. The structure is 47 ft (14.3 m) long and 26 ft wide. If it were closed, the detour would be 620.7 mi (999 km).

CarriesNo Data Entered
CrossesNo Data Entered
LocationNo Data Entered
RouteFederal Lands Road 468
StateIdaho
Coordinates45.70301, -114.57935
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating31.1 US tons
Inventory rating14.3 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 20
Structure length47 ft (14.3 m)
Longest span46 ft (14 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10 (—)
Projected traffic15 by 2045
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed620.7 mi (999 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was No Data Entered over No Data Entered built?

It was built in 2011, making it 14 years old in 2025.

What condition is No Data Entered over No Data Entered in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does No Data Entered over No Data Entered carry?

About 10 vehicles per day (latest count).

How long is No Data Entered over No Data Entered?

The structure is 47 ft (14.3 m) long with a longest span of 46 ft (14 m) and a deck 26 ft wide.

Who owns No Data Entered over No Data Entered?

It is owned by the U.S. Forest Service.