US Bridges

B Ave over S. Fork Clearwater

Fair

Idaho County, Idaho · In Kooskia;b Ave-Front ST · Structure no. 000000000029140

Built
1963
62 years old
Condition
Fair
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
247 ft
4 main spans
Daily traffic
100
2023 count
Owner
Local
Other Local Agency

About this bridge

B Ave over S. Fork Clearwater is a prestressed concrete stringer/multi-beam or girder carrying B Ave over S. Fork Clearwater in Idaho County, Idaho. It was built in 1963, so it is 62 years old, older than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 150 by 2039. The structure is 247 ft (75.3 m) long and 29 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesB Ave
CrossesS. Fork Clearwater
LocationIn Kooskia;b Ave-Front ST
RouteCity Street 0
StateIdaho
Coordinates46.14127, -115.98132
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating71 US tons
Inventory rating40 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length247 ft (75.3 m)
Longest span60 ft (18.3 m)
Deck width29 ft (8.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2023)
Projected traffic150 by 2039
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was B Ave over S. Fork Clearwater built?

It was built in 1963, making it 62 years old in 2025.

What condition is B Ave over S. Fork Clearwater in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does B Ave over S. Fork Clearwater carry?

About 100 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is B Ave over S. Fork Clearwater?

The structure is 247 ft (75.3 m) long with a longest span of 60 ft (18.3 m) and a deck 29 ft wide.

Who owns B Ave over S. Fork Clearwater?

It is owned by the Other Local Agency.