2300 East Road over N.Gooding Main Canal
FairGooding County, Idaho · 5.2 N. 4.0 E. Gooding · Structure no. 000000000024405
- Built
- 1985
- 40 years old
- Condition
- Fair
- inspected March 2021
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 30 ft
- 2 main spans
- Daily traffic
- 10
- 2023 count
- Owner
- Local
- Other Local Agency
About this bridge
2300 East Road over N.Gooding Main Canal is a steel continuous stringer/multi-beam or girder carrying 2300 East Road over N.Gooding Main Canal in Gooding County, Idaho. It was built in 1985, so it is 40 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10 vehicles a day, roughly 10% of them trucks, projected to reach 15 by 2039. The structure is 30 ft (9.1 m) long and 16 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 2300 East Road over N.Gooding Main Canal built?
It was built in 1985, making it 40 years old in 2025.
What condition is 2300 East Road over N.Gooding Main Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2021.
How much traffic does 2300 East Road over N.Gooding Main Canal carry?
About 10 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is 2300 East Road over N.Gooding Main Canal?
The structure is 30 ft (9.1 m) long with a longest span of 15 ft (4.6 m) and a deck 16 ft wide.
Who owns 2300 East Road over N.Gooding Main Canal?
It is owned by the Other Local Agency.