North Road over Dry Creek
FairPosted for loadGooding County, Idaho · 5.2 N. 3.6 W. Gooding · Structure no. 000000000024375
- Built
- 1930
- 95 years old, rebuilt 1972
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 43 ft
- 2 main spans
- Daily traffic
- 30
- 2023 count
- Owner
- Local
- Other Local Agency
About this bridge
North Road over Dry Creek is a steel stringer/multi-beam or girder carrying North Road over Dry Creek in Gooding County, Idaho. It was built in 1930 and reconstructed in 1972, so it is 95 years old, older than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 30 vehicles a day, roughly 10% of them trucks, projected to reach 45 by 2039. The structure is 43 ft (13.1 m) long and 23 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was North Road over Dry Creek built?
It was built in 1930, making it 95 years old in 2025. It was reconstructed in 1972.
What condition is North Road over Dry Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does North Road over Dry Creek carry?
About 30 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is North Road over Dry Creek?
The structure is 43 ft (13.1 m) long with a longest span of 21 ft (6.4 m) and a deck 23 ft wide.
Who owns North Road over Dry Creek?
It is owned by the Other Local Agency.