2000 South Road over T.F.Northside Main Cnl
FairGooding County, Idaho · 2.0 S. 0.5 E. Gooding · Structure no. 000000000024325
- Built
- 1930
- 95 years old, rebuilt 1963
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 31 ft
- 1 main span
- Daily traffic
- 160
- 2023 count
- Owner
- Local
- Other Local Agency
About this bridge
2000 South Road over T.F.Northside Main Cnl is a steel stringer/multi-beam or girder carrying 2000 South Road over T.F.Northside Main Cnl in Gooding County, Idaho. It was built in 1930 and reconstructed in 1963, so it is 95 years old, older than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 160 vehicles a day, roughly 14% of them trucks, projected to reach 240 by 2042. The structure is 31 ft (9.4 m) long and 25 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 2000 South Road over T.F.Northside Main Cnl built?
It was built in 1930, making it 95 years old in 2025. It was reconstructed in 1963.
What condition is 2000 South Road over T.F.Northside Main Cnl in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does 2000 South Road over T.F.Northside Main Cnl carry?
About 160 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is 2000 South Road over T.F.Northside Main Cnl?
The structure is 31 ft (9.4 m) long with a longest span of 30 ft (9.1 m) and a deck 25 ft wide.
Who owns 2000 South Road over T.F.Northside Main Cnl?
It is owned by the Other Local Agency.