US Bridges

Stc 3809;MIDDLE Fk over Yuba River

Fair

Elmore County, Idaho · 0.2 S. 1.2 W. Atlanta · Structure no. 000000000028000

Built
1965
60 years old
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
79 ft
3 main spans
Daily traffic
30
2023 count
Owner
Local
Other Local Agency

About this bridge

Stc 3809;MIDDLE Fk over Yuba River is a steel continuous stringer/multi-beam or girder carrying Stc 3809;MIDDLE Fk over Yuba River in Elmore County, Idaho. It was built in 1965, so it is 60 years old, older than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 30 vehicles a day, projected to reach 45 by 2042. The structure is 79 ft (24.1 m) long and 28 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesStc 3809;MIDDLE Fk
CrossesYuba River
Location0.2 S. 1.2 W. Atlanta
RouteCounty Highway 3809
StateIdaho
Coordinates43.80022, -115.15836
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55 US tons
Inventory rating37 US tons

Structure

MaterialSteel Continuous
DeckWood or timber
Main spans3
Design loadHS 20
Structure length79 ft (24.1 m)
Longest span48 ft (14.6 m)
Deck width28 ft (8.4 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30 (2023)
Projected traffic45 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Stc 3809;MIDDLE Fk over Yuba River built?

It was built in 1965, making it 60 years old in 2025.

What condition is Stc 3809;MIDDLE Fk over Yuba River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does Stc 3809;MIDDLE Fk over Yuba River carry?

About 30 vehicles per day (2023 count).

How long is Stc 3809;MIDDLE Fk over Yuba River?

The structure is 79 ft (24.1 m) long with a longest span of 48 ft (14.6 m) and a deck 28 ft wide.

Who owns Stc 3809;MIDDLE Fk over Yuba River?

It is owned by the Other Local Agency.