US Bridges

Fdr over Salmon River

Fair

Custer County, Idaho · 7 Miles East Stanley · Structure no. 041403000001098

Built
1967
58 years old
Condition
Fair
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
120 ft
1 main span
Daily traffic
50
Owner
Federal
U.S. Forest Service

About this bridge

Fdr over Salmon River is a steel continuous stringer/multi-beam or girder carrying Fdr over Salmon River in Custer County, Idaho. It was built in 1967, so it is 58 years old, older than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 120 ft (36.6 m) long and 17 ft wide.

CarriesFdr
CrossesSalmon River
Location7 Miles East Stanley
RouteFederal Lands Road 70626
StateIdaho
Coordinates44.26266, -114.79308
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment3: Basically intolerable, requiring high priority of corrective action
Operating rating23.6 US tons
Inventory rating18.2 US tons

Structure

MaterialSteel Continuous
DeckWood or timber
Main spans1
Design loadH 20
Structure length120 ft (36.6 m)
Longest span80 ft (24.4 m)
Deck width17 ft (5.3 m)
Roadway width16 ft (4.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (—)
Projected traffic75 by 2045
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Fdr over Salmon River built?

It was built in 1967, making it 58 years old in 2025.

What condition is Fdr over Salmon River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Fdr over Salmon River carry?

About 50 vehicles per day (latest count).

How long is Fdr over Salmon River?

The structure is 120 ft (36.6 m) long with a longest span of 80 ft (24.4 m) and a deck 17 ft wide.

Who owns Fdr over Salmon River?

It is owned by the U.S. Forest Service.