2200 S Road over West Canal

Good

Cassia County, Idaho · 1.7 S. 1.5 W. Oakley · Structure no. 000000000023973

Built
2023
2 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
45 ft
1 main span
Daily traffic
20
2023 count
Owner
Local
Other Local Agency

About this bridge

2200 S Road over West Canal is a steel stringer/multi-beam or girder carrying 2200 S Road over West Canal in Cassia County, Idaho. It was built in 2023, so it is 2 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20 vehicles a day, roughly 10% of them trucks, projected to reach 30 by 2039. The structure is 45 ft (13.7 m) long and 32 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

Carries2200 S Road
CrossesWest Canal
Location1.7 S. 1.5 W. Oakley
RouteCounty Highway 0
StateIdaho
Coordinates42.21444, -113.91299
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.3 US tons
Inventory rating42.9 US tons

Structure

MaterialSteel
DeckCorrugated steel
Main spans1
Design loadHL 93
Structure length45 ft (13.7 m)
Longest span41 ft (12.6 m)
Deck width32 ft (9.8 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20 (2023)
Projected traffic30 by 2039
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 2200 S Road over West Canal built?

It was built in 2023, making it 2 years old in 2025.

What condition is 2200 S Road over West Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does 2200 S Road over West Canal carry?

About 20 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is 2200 S Road over West Canal?

The structure is 45 ft (13.7 m) long with a longest span of 41 ft (12.6 m) and a deck 32 ft wide.

Who owns 2200 S Road over West Canal?

It is owned by the Other Local Agency.