US Bridges

Front Street over I 84B;NAMPA 11th Ave UP

Good

Canyon County, Idaho · In Nampa;front St. · Structure no. 000000000027696

Built
2003
22 years old
Condition
Good
inspected April 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
72 ft
1 main span
Daily traffic
22,500
2023 count
Owner
State
State Highway Agency

About this bridge

Front Street over I 84B;NAMPA 11th Ave UP is a prestressed concrete box beam or girders - multiple carrying Front Street over I 84B;NAMPA 11th Ave UP in Canyon County, Idaho. It was built in 2003, so it is 22 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 22,500 vehicles a day, roughly 6% of them trucks, projected to reach 33,750 by 2042. The structure is 72 ft (21.9 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFront Street
CrossesI 84B;NAMPA 11th Ave UP
LocationIn Nampa;front St.
RouteCity Street 0
StateIdaho
Coordinates43.58028, -116.56
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating38 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 25 or greater
Structure length72 ft (21.9 m)
Longest span68 ft (20.6 m)
Deck width40 ft (12.3 m)
Roadway width27 ft (8.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22,500 (2023)
Projected traffic33,750 by 2042
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Front Street over I 84B;NAMPA 11th Ave UP built?

It was built in 2003, making it 22 years old in 2025.

What condition is Front Street over I 84B;NAMPA 11th Ave UP in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Front Street over I 84B;NAMPA 11th Ave UP carry?

About 22,500 vehicles per day (2023 count), of which roughly 6% are trucks.

How long is Front Street over I 84B;NAMPA 11th Ave UP?

The structure is 72 ft (21.9 m) long with a longest span of 68 ft (20.6 m) and a deck 40 ft wide.

Who owns Front Street over I 84B;NAMPA 11th Ave UP?

It is owned by the State Highway Agency.