STC3742;WAMSTAD RD over Boise River
FairCanyon County, Idaho · 1.2 S. 0.3 W. Parma · Structure no. 000000000027435
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 198 ft
- 2 main spans
- Daily traffic
- 2,700
- 2023 count
- Owner
- Local
- Other Local Agency
About this bridge
STC3742;WAMSTAD RD over Boise River is a prestressed concrete stringer/multi-beam or girder carrying STC3742;WAMSTAD RD over Boise River in Canyon County, Idaho. It was built in 1975, so it is 50 years old, older than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,700 vehicles a day, roughly 16% of them trucks, projected to reach 4,050 by 2042. The structure is 198 ft (60.4 m) long and 38 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was STC3742;WAMSTAD RD over Boise River built?
It was built in 1975, making it 50 years old in 2025.
What condition is STC3742;WAMSTAD RD over Boise River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does STC3742;WAMSTAD RD over Boise River carry?
About 2,700 vehicles per day (2023 count), of which roughly 16% are trucks.
How long is STC3742;WAMSTAD RD over Boise River?
The structure is 198 ft (60.4 m) long with a longest span of 97 ft (29.6 m) and a deck 38 ft wide.
Who owns STC3742;WAMSTAD RD over Boise River?
It is owned by the Other Local Agency.