Stp 8213;MIDDLETON over I 84; Middleton Rd. Gs
GoodCanyon County, Idaho · 3.2 W. Nampa Wcl · Structure no. 000000000019711
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 225 ft
- 2 main spans
- Daily traffic
- 8,900
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Stp 8213;MIDDLETON over I 84; Middleton Rd. Gs is a concrete stringer/multi-beam or girder carrying Stp 8213;MIDDLETON over I 84; Middleton Rd. Gs in Canyon County, Idaho. It was built in 2021, so it is 4 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,900 vehicles a day, roughly 4% of them trucks, projected to reach 13,350 by 2042. The structure is 225 ft (68.6 m) long and 48 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stp 8213;MIDDLETON over I 84; Middleton Rd. Gs built?
It was built in 2021, making it 4 years old in 2025.
What condition is Stp 8213;MIDDLETON over I 84; Middleton Rd. Gs in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does Stp 8213;MIDDLETON over I 84; Middleton Rd. Gs carry?
About 8,900 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is Stp 8213;MIDDLETON over I 84; Middleton Rd. Gs?
The structure is 225 ft (68.6 m) long with a longest span of 113 ft (34.4 m) and a deck 48 ft wide.
Who owns Stp 8213;MIDDLETON over I 84; Middleton Rd. Gs?
It is owned by the State Highway Agency.