US Bridges

Fdr over Big Smoky Creek

Fair

Camas County, Idaho · 2 Miles West Big Smoky Jt · Structure no. 041405000001082

Built
1953
72 years old
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
63 ft
1 main span
Daily traffic
50
Owner
Federal
U.S. Forest Service

About this bridge

Fdr over Big Smoky Creek is a steel stringer/multi-beam or girder carrying Fdr over Big Smoky Creek in Camas County, Idaho. It was built in 1953, so it is 72 years old, older than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 63 ft (19.2 m) long and 14 ft wide.

CarriesFdr
CrossesBig Smoky Creek
Location2 Miles West Big Smoky Jt
RouteCounty Highway 70227
StateIdaho
Coordinates43.60712, -114.89461
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating31.7 US tons
Inventory rating24.7 US tons

Structure

MaterialSteel
DeckWood or timber
Main spans1
Design loadH 20
Structure length63 ft (19.2 m)
Longest span63 ft (19.2 m)
Deck width14 ft (4.3 m)
Roadway width13 ft (3.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (—)
Projected traffic75 by 2045
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Fdr over Big Smoky Creek built?

It was built in 1953, making it 72 years old in 2025.

What condition is Fdr over Big Smoky Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does Fdr over Big Smoky Creek carry?

About 50 vehicles per day (latest count).

How long is Fdr over Big Smoky Creek?

The structure is 63 ft (19.2 m) long with a longest span of 63 ft (19.2 m) and a deck 14 ft wide.

Who owns Fdr over Big Smoky Creek?

It is owned by the U.S. Forest Service.