Stagecoach Road over Trail Creek
GoodPosted for loadBoundary County, Idaho · At Naples · Structure no. 000000000030307
- Built
- 2007
- 18 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 22 ft
- 1 main span
- Daily traffic
- 810
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Stagecoach Road over Trail Creek is a steel stringer/multi-beam or girder carrying Stagecoach Road over Trail Creek in Boundary County, Idaho. It was built in 2007, so it is 18 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 810 vehicles a day, roughly 4% of them trucks, projected to reach 1,215 by 2039. The structure is 22 ft (6.7 m) long and 14 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stagecoach Road over Trail Creek built?
It was built in 2007, making it 18 years old in 2025.
What condition is Stagecoach Road over Trail Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does Stagecoach Road over Trail Creek carry?
About 810 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is Stagecoach Road over Trail Creek?
The structure is 22 ft (6.7 m) long with a longest span of 22 ft (6.7 m) and a deck 14 ft wide.
Who owns Stagecoach Road over Trail Creek?
It is owned by the County Highway Agency.