US Bridges

Stagecoach Road over Trail Creek

GoodPosted for load

Boundary County, Idaho · At Naples · Structure no. 000000000030307

Built
2007
18 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
22 ft
1 main span
Daily traffic
810
2023 count
Owner
County
County Highway Agency

About this bridge

Stagecoach Road over Trail Creek is a steel stringer/multi-beam or girder carrying Stagecoach Road over Trail Creek in Boundary County, Idaho. It was built in 2007, so it is 18 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.

It carries about 810 vehicles a day, roughly 4% of them trucks, projected to reach 1,215 by 2039. The structure is 22 ft (6.7 m) long and 14 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesStagecoach Road
CrossesTrail Creek
LocationAt Naples
RouteCounty Highway 0
StateIdaho
Coordinates48.57653, -116.39086
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating38 US tons
Inventory rating22 US tons

Structure

MaterialSteel
DeckCorrugated steel
Main spans1
Design loadHS 20
Structure length22 ft (6.7 m)
Longest span22 ft (6.7 m)
Deck width14 ft (4.3 m)
Roadway width14 ft (4.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic810 (2023)
Projected traffic1,215 by 2039
Trucks4%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$429,000 (2019 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Stagecoach Road over Trail Creek built?

It was built in 2007, making it 18 years old in 2025.

What condition is Stagecoach Road over Trail Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Stagecoach Road over Trail Creek carry?

About 810 vehicles per day (2023 count), of which roughly 4% are trucks.

How long is Stagecoach Road over Trail Creek?

The structure is 22 ft (6.7 m) long with a longest span of 22 ft (6.7 m) and a deck 14 ft wide.

Who owns Stagecoach Road over Trail Creek?

It is owned by the County Highway Agency.