US Bridges

E 121 ST S over Idaho Canal; Hampton Br

Good

Bonneville County, Idaho · 0.5 N 0.5 E Taylorville · Structure no. 000000000031091

Built
2023
2 years old
Condition
Good
inspected November 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
40 ft
1 main span
Daily traffic
80
2023 count
Owner
County
County Highway Agency

About this bridge

E 121 ST S over Idaho Canal; Hampton Br is a prestressed concrete box beam or girders - multiple carrying E 121 ST S over Idaho Canal; Hampton Br in Bonneville County, Idaho. It was built in 2023, so it is 2 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 80 vehicles a day, roughly 10% of them trucks, projected to reach 120 by 2042. The structure is 40 ft (12.2 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesE 121 ST S
CrossesIdaho Canal; Hampton Br
Location0.5 N 0.5 E Taylorville
RouteCounty Highway 0
StateIdaho
Coordinates43.38842, -112.02394
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72.5 US tons
Inventory rating55.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length40 ft (12.2 m)
Longest span37 ft (11.4 m)
Deck width41 ft (12.6 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic80 (2023)
Projected traffic120 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was E 121 ST S over Idaho Canal; Hampton Br built?

It was built in 2023, making it 2 years old in 2025.

What condition is E 121 ST S over Idaho Canal; Hampton Br in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does E 121 ST S over Idaho Canal; Hampton Br carry?

About 80 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is E 121 ST S over Idaho Canal; Hampton Br?

The structure is 40 ft (12.2 m) long with a longest span of 37 ft (11.4 m) and a deck 41 ft wide.

Who owns E 121 ST S over Idaho Canal; Hampton Br?

It is owned by the County Highway Agency.